Cards

Rigs (Hardware)

Hardware rigs that provide HDD and RAM capacity — your foundation for everything.

Rigs Overview

Rigs are hardware permanents that provide HDD and RAM capacity. Without rigs, you have no storage and no processing power. Upgrading rigs is the single most impactful progression step.

Complete Rig Comparison

RigHDDRAMLink SlotsBuy Order CostDuration
Dan’s Laptop+5,750+2562Free (starter)
Dedicated Tor Node+11,500+51221,800 money48h
Polish Server+20,700+1,02432,500 money65h
Repurposed Mining Rig+32,200+2,04863,500 money72h
Icelandic Datacenter Node+46,000+3,20046,000 money96h
Data Center Rack+63,250+4,500512,000 money122h
Co-location Rack+86,250+6,000514,000 money130h
Superprocessor Mainframe+128,800+8,000875,000 money254h

All Rigs (Detailed)

Dan’s Laptop (Starter)

Your starting rig. Extremely limited — upgrade as soon as possible.

  • HDD: +5,750
  • RAM: +256
  • Link Slots: 2
  • Cost: Free (starting equipment)

Dedicated Tor Node

The cheapest upgrade. Privacy-focused but modest capacity.

  • HDD: +11,500
  • RAM: +512
  • Link Slots: 2
  • Buy Order Cost: 1,800 money (48h duration, 50 HDD, 1 RAM)

Polish Server

Budget entry-level server. Triple the laptop’s HDD.

  • HDD: +20,700
  • RAM: +1,024
  • Link Slots: 3
  • Buy Order Cost: 2,500 money (65h duration, 51 HDD, 1 RAM)

Repurposed Mining Rig

Balanced mid-tier option with the most link slots for its price.

  • HDD: +32,200
  • RAM: +2,048
  • Link Slots: 6
  • Buy Order Cost: 3,500 money (72h duration, 60 HDD, 1 RAM)

Icelandic Datacenter Node

High-capacity option with good RAM.

  • HDD: +46,000
  • RAM: +3,200
  • Link Slots: 4
  • Buy Order Cost: 6,000 money (96h duration, 77 HDD, 1 RAM)

Data Center Rack

The classic first major upgrade. 11x Dan’s Laptop HDD, 17x RAM.

  • HDD: +63,250
  • RAM: +4,500
  • Link Slots: 5
  • Buy Order Cost: 12,000 money (122h duration, 102 HDD, 2 RAM)

Co-location Rack

High-end option between Data Center Rack and Mainframe.

  • HDD: +86,250
  • RAM: +6,000
  • Link Slots: 5
  • Buy Order Cost: 14,000 money (130h duration, 128 HDD, 2 RAM)

Superprocessor Mainframe (Endgame)

The most powerful rig in the game. Maximum capacity across the board.

  • HDD: +128,800
  • RAM: +8,000
  • Link Slots: 8
  • Buy Order Cost: 75,000 money (254h duration, 255 HDD, 4 RAM)

Cost Efficiency

Which rig gives you the most capacity per money spent?

RigHDD per 1K MoneyRAM per 1K MoneyBest For
Dedicated Tor Node6,389284Cheapest entry
Polish Server8,280410Budget HDD
Repurposed Mining Rig9,200585Best link slots
Icelandic Datacenter Node7,667533Balanced
Data Center Rack5,271375Classic choice
Co-location Rack6,161429High capacity
Superprocessor Mainframe1,717107Max capacity

The Repurposed Mining Rig is the most cost-efficient by raw HDD/money ratio. However, the Data Center Rack remains the best overall first upgrade due to its high absolute capacity.

The Superprocessor Mainframe is expensive per unit but provides the highest absolute capacity and link slots.

Buy Orders

Rigs are acquired by running Buy Order executable cards. Each buy order is a thread that resolves into the corresponding rig permanent. Buy orders have minimal HDD/RAM costs (50–255 HDD, 1–4 RAM) — the real cost is money.

Each rig has link slots where software permanents can be attached. Link slots are used for:

  • Linking Memecoin Central or Stablecoin Market to Crypto Wallet
  • Attaching software constructs to hardware infrastructure

More link slots = more flexibility for complex card setups. The Repurposed Mining Rig (6 slots) and Superprocessor Mainframe (8 slots) are best for complex builds.

Upgrade Strategy

  1. Dan’s Laptop → Polish Server or Dedicated Tor Node — cheapest capacity boost if you can’t afford Data Center Rack yet
  2. Dan’s Laptop → Data Center Rack — the standard first major upgrade. Save up 12,000 money
  3. Data Center Rack → Co-location Rack or Superprocessor Mainframe — when you need more capacity for advanced card trees and batch merging
  4. Multiple rigs stack — you can have multiple rigs mounted simultaneously. Two Data Center Racks = 126,500 HDD and 9,000 RAM

Tips

  • Upgrade early — the ROI on rig upgrades far exceeds any other investment
  • Don’t hoard on Dan’s Laptop — you’ll quickly run out of HDD and RAM
  • Link slots matter — plan your permanent layout around available link slots
  • Consider intermediate rigs — Polish Server (2,500 money) is achievable much earlier than Data Center Rack (12,000 money)
  • Mainframe is endgame — 75,000 money is a huge investment. Make sure you’ve established income streams first